Housing
Will I be able to afford to live here?
Not reviewed yet. Know something?
Candidate for Ward 8 College Councillor
This candidate hasn’t listed a campaign website or social account with the Town. That says nothing about them as a candidate — it just means less of their material is published online for us to summarise.
Every candidate in this race is shown against the same 16 issues, in the same order, whether or not we’ve found something for each one. Why we do it this way.
Will I be able to afford to live here?
Not reviewed yet. Know something?
What happens to my tax bill, and where does the money go?
This candidate has spoken about this issue more than once. Each statement is shown with its own source.
Malloum Abakar would consider Increased federal infrastructure funding; Increased provincial infrastructure funding; Development charges for growth-related infrastructure; Municipal debt for long-lived infrastructure; Other to address Ottawa's infrastructure requirements.
“• Increased federal infrastructure funding • Increased provincial infrastructure funding • Development charges for growth-related infrastructure • Municipal debt for long-lived infrastructure • Other”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would consider Increased federal infrastructure funding; Increased provincial infrastructure funding
“• Increased federal infrastructure funding • Increased provincial infrastructure funding • Development charges for growth-related infrastructure • Municipal debt for long-lived infrastructure • Other”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
When I call for help, will it come fast enough?
Not reviewed yet. Know something?
Can I get where I need to go without driving?
This candidate has spoken about this issue more than once. Each statement is shown with its own source.
Malloum Abakar commented: “Baseline BRT first. It was studied in 2017, and nine years later only one intersection is funded.
“Baseline BRT first. It was studied in 2017, and nine years later only one intersection is funded. And that's while towers along the corridor keep getting approved. Dedicated bus lanes are the fastest and most affordable way to serve that growth. Line 1 must reach Algonquin station after the July 1 flood, with the repair cost and new opening date published. Before any new rail extension, residents should see a yearly report on every committed transit project: what was promised, what it costs, where it stands.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commented: “Baseline BRT first. It was studied in 2017, and nine years later only one intersection is funded. And that's while towers along the corridor keep getting approved. Dedicated bus lanes are the fastest and most affordable way to serve that growth. Line…
“Baseline BRT first. It was studied in 2017, and nine years later only one intersection is funded. And that's while towers along the corridor keep getting approved. Dedicated bus lanes are the fastest and most affordable way to serve that growth. Line 1 must reach Algonquin station after the July 1 flood, with the repair cost and new opening date published. Before any new rail extension, residents should see a yearly report on every committed transit project: what was promised, what it costs, where it stands.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commented: “Fix and finish before we expand. The Baseline rapid transit corridor was studied in 2017. nine years later only one intersection is funded, while towers along the corridor keep getting approved. Buses on dedicated lanes are the fastest, most…
“Fix and finish before we expand. The Baseline rapid transit corridor was studied in 2017. nine years later only one intersection is funded, while towers along the corridor keep getting approved. Buses on dedicated lanes are the fastest, most affordable way to serve that growth. Sidewalks and safe crossings come next: they decide whether seniors and students can reach the bus at all. Rail matters, but Line 1 needs to reach Algonquin first, after the July 1 flood. New roads come last: we can't maintain the ones we have, with a $10.8 billion ten-year.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would defer, reconsider or not pursue as a second initiative: “stage 3 LRT, Kanata–Stittsville”.
“stage 3 LRT, Kanata–Stittsville”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would prioritize bus Rapid Transit projects such as Baseline BRT if Ottawa receives significant new transit funding.
“Bus Rapid Transit projects such as Baseline BRT”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar assigns highest priority — advance immediately to the Baseline BRT corridor across the Baseline–Heron corridor.
“Highest priority — advance immediately”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commented: “Fix and finish before we expand. The Baseline rapid transit corridor was studied in 2017.
“Fix and finish before we expand. The Baseline rapid transit corridor was studied in 2017. nine years later only one intersection is funded, while towers along the corridor keep getting approved. Buses on dedicated lanes are the fastest, most affordable way to serve that growth. Sidewalks and safe crossings come next: they decide whether seniors and students can reach the bus at all. Rail matters, but Line 1 needs to reach Algonquin first, after the July 1 flood. New roads come last: we can't maintain the ones we have, with a $10.8 billion ten-year.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar assigns medium priority to the western Stage 3 LRT extension toward Kanata and Stittsville.
“Medium priority”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar names “Baseline BRT” as their second infrastructure priority for 2026–2030.
“Baseline BRT”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar is undecided on, saying more study is required for the proposed STO Gatineau–Ottawa tram.
“Undecided / more study required”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Will decisions be made in the open, and will anyone answer for them?
Not reviewed yet. Know something?
Will the things I use every day actually get fixed?
This candidate has spoken about this issue more than once. Each statement is shown with its own source.
Malloum Abakar selected Advocate for accelerated rehabilitation of aging pavement, bridges and structures; Coordinate provincial construction schedules to reduce simultaneous traffic disruptions as Ottawa's position on Highway 417 investment.
“• Advocate for accelerated rehabilitation of aging pavement, bridges and structures • Coordinate provincial construction schedules to reduce simultaneous traffic disruptions”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar is undecided on, saying more information is required for transferring ownership and responsibility for Ottawa Road 174 to the Ontario Ministry of Transportation.
“Undecided / more information required”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar ranked “Flood prevention, stormwater and sewer infrastructure” as their #1 infrastructure investment priority.
“1. Flood prevention, stormwater and sewer infrastructure 2. Renewal of existing roads and bridges 3. Public transit — buses and Bus Rapid Transit 4. Pedestrian infrastructure and sidewalks 5. Public transit — rail 6. Cycling infrastructure 7. Truck and goods movement infrastructure 8. New or expanded roads”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar supports increasing Ottawa's road resurfacing and road renewal budget during the next term of Council.
“Support”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would prioritize Larger or upgraded storm sewers in flood-prone areas; Creek, culvert and drainage improvements; Residential flood-protection programs, including backwater valves and sump systems for additional flood resilience investment.
“• Larger or upgraded storm sewers in flood-prone areas • Creek, culvert and drainage improvements • Residential flood-protection programs, including backwater valves and sump systems”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar names “accelerated sewer separation and flood resilience infrastructure” as their first infrastructure priority for 2026–2030.
“accelerated sewer separation and flood resilience infrastructure”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would establish flood resilience and stormwater infrastructure as one of Ottawa's top three capital priorities.
“Yes”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar names “Road resurfacing and renewal” as their third infrastructure priority for 2026–2030.
“Road resurfacing and renewal”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commented: “Before studying a new highway, Ottawa should fix what it already owns. The City's asset management plans show a $10.8 billion ten-year renewal gap. A bypass would add decades of maintenance to that list. If the Province wants to study it, the study…
“Before studying a new highway, Ottawa should fix what it already owns. The City's asset management plans show a $10.8 billion ten-year renewal gap. A bypass would add decades of maintenance to that list. If the Province wants to study it, the study should publish full lifecycle costs, not just construction costs, before the City commits anything.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar named Accelerated sewer separation and flood resilience infrastructure; Road resurfacing and renewal; Baseline BRT; Sidewalk and pedestrian network investment; Bridge and structural renewal among the five initiatives deserving the greatest attention.
“• Accelerated sewer separation and flood resilience infrastructure • Road resurfacing and renewal • Baseline BRT • Sidewalk and pedestrian network investment • Bridge and structural renewal”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar ranked “Transit — bus / BRT” as the transportation mode most deserving additional public investment.
“1. Transit — bus / BRT 2. Pedestrian 3. Transit — rail 4. Cycling 5. Vehicular / road infrastructure 6. Truck / goods movement”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar: additional road-renewal funding should be directed principally to allocation based principally on road condition and risk.
“Allocation based principally on road condition and risk”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar: Primarily renewal — Ottawa should prioritize repairing existing infrastructure before undertaking significant new expansion.
“Primarily renewal — Ottawa should prioritize repairing existing infrastructure before undertaking significant new expansion.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar is undecided on a Kettle Island interprovincial bridge, saying more study is required.
“Undecided / more study required”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar: Support selectively, after considering costs, safety, land use, environmental effects and alternatives
“Support selectively, after considering costs, safety, land use, environmental effects and alternatives”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would defer, reconsider or not pursue as a first initiative: “Study of an Ottawa ring road or regional bypass”.
“Study of an Ottawa ring road or regional bypass”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar is undecided on, saying more information is required for transferring ownership and responsibility for Ottawa Road 174 to
“Undecided / more information required”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar selected Advocate for accelerated rehabilitation of aging pavement, bridges and structures
“• Advocate for accelerated rehabilitation of aging pavement, bridges and structures • Coordinate provincial construction schedules to reduce simultaneous traffic disruptions”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar named Accelerated sewer separation and flood resilience infrastructure; Road resurfacing and renewal; Baseline BRT
“• Accelerated sewer separation and flood resilience infrastructure • Road resurfacing and renewal • Baseline BRT • Sidewalk and pedestrian network investment • Bridge and structural renewal”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar says the City should require or evaluate Acceptable environmental and land-use impacts
“• Acceptable environmental and land-use impacts • Acceptable City financial contribution and senior-government cost sharing”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar's infrastructure vision: “An Ottawa that fixes what it owns before it expands, and shows its work.
“An Ottawa that fixes what it owns before it expands, and shows its work. The City's asset management plans show a $10.8 billion ten-year renewal gap. The 2026 capital budget names road work street by street, but lists the largest stormwater line, $33.4 million for culverts, as "City Wide." Residents can't hold anyone accountable for spending they can't see. Three principles. Flooding comes first: storm sewers, culverts and drainage in the areas that flooded on July 1. Capacity before density: every planning approval should carry a published servicing statement, what the pipes below can take and what the approval adds. Service that arrives: the Baseline corridor was studied in 2017, and nine years later only one intersection is funded. One page a year, ward by ward, so anyone can compare what was spent with what was fixed. Answering the phone is the minimum. Showing your work is the job.”
(several paragraphs)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar says the City should require or evaluate Acceptable environmental and land-use impacts; Acceptable City financial contribution and senior-government cost sharing for a new interprovincial crossing.
“• Acceptable environmental and land-use impacts • Acceptable City financial contribution and senior-government cost sharing”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar's infrastructure vision: “An Ottawa that fixes what it owns before it expands, and shows its work. The City's asset management plans show a $10.8 billion ten-year renewal gap. The 2026 capital budget names road work street by street, but lists the largest…
“An Ottawa that fixes what it owns before it expands, and shows its work. The City's asset management plans show a $10.8 billion ten-year renewal gap. The 2026 capital budget names road work street by street, but lists the largest stormwater line, $33.4 million for culverts, as "City Wide." Residents can't hold anyone accountable for spending they can't see. Three principles. Flooding comes first: storm sewers, culverts and drainage in the areas that flooded on July 1. Capacity before density: every planning approval should carry a published servicing statement, what the pipes below can take and what the approval adds. Service that arrives: the Baseline corridor was studied in 2017, and nine years later only one intersection is funded. One page a year, ward by ward, so anyone can compare what was spent with what was fixed. Answering the phone is the minimum. Showing your work is the job.”
(several paragraphs)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would prioritize Larger or upgraded storm sewers in flood-prone areas; Creek, culvert and drainage improvements
“• Larger or upgraded storm sewers in flood-prone areas • Creek, culvert and drainage improvements • Residential flood-protection programs, including backwater valves and sump systems”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commented: “Before studying a new highway, Ottawa should fix what it already owns.
“Before studying a new highway, Ottawa should fix what it already owns. The City's asset management plans show a $10.8 billion ten-year renewal gap. A bypass would add decades of maintenance to that list. If the Province wants to study it, the study should publish full lifecycle costs, not just construction costs, before the City commits anything.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar names “accelerated sewer separation and flood resilience infrastructure” as their first infrastructure priority for
“accelerated sewer separation and flood resilience infrastructure”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar says further information is required before deciding on a ring road or bypass study.
“Perhaps — further information is required”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Will our main streets and local jobs thrive?
Not reviewed yet. Know something?
Is the candidate protecting the nature we live in?
Not reviewed yet. Know something?
Will there be a doctor and a hospital when we need one?
Not reviewed yet. Know something?
How fast should we grow, and who decides what gets built where?
Not reviewed yet. Know something?
Who looks after the most vulnerable residents?
Not reviewed yet. Know something?
Can I walk and bike safely around town?
This candidate has spoken about this issue more than once. Each statement is shown with its own source.
Malloum Abakar would maintain approximately current cycling infrastructure investment.
“Maintain approximately current investment”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would emphasize Connections to LRT and major transit stations; Maintenance and renewal of existing cycling infrastructure before expansion in cycling network investment.
“• Connections to LRT and major transit stations • Maintenance and renewal of existing cycling infrastructure before expansion”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar would emphasize Connections to LRT and major transit stations; Maintenance and renewal of existing cycling infrastructure
“• Connections to LRT and major transit stations • Maintenance and renewal of existing cycling infrastructure before expansion”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar strongly supports increasing Ottawa's investment in sidewalks, pedestrian crossings and connections to transit.
“Strongly support”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Does the candidate value what makes this place feel alive?
Not reviewed yet. Know something?
Should energy-hungry data centres be welcomed here?
Not reviewed yet. Know something?
Is our drinking water safe and our waste handled?
This candidate has spoken about this issue more than once. Each statement is shown with its own source.
Malloum Abakar supports accelerating separation of remaining combined sewers.
“Support”
(one sentence)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commits to advancing “One page a year: stormwater spending, published ward by ward, tabled with the water rate review. On July 1, College Ward filed 2,282 service requests, more than any other ward in Ottawa. Residents pay a stormwater charge of $252.97 this…
“One page a year: stormwater spending, published ward by ward, tabled with the water rate review. On July 1, College Ward filed 2,282 service requests, more than any other ward in Ottawa. Residents pay a stormwater charge of $252.97 this year, up 7.6%, and deserve to see what it fixed on their street.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Malloum Abakar commits to advancing “One page a year: stormwater spending, published ward by ward, tabled with the water rate review.
“One page a year: stormwater spending, published ward by ward, tabled with the water rate review. On July 1, College Ward filed 2,282 service requests, more than any other ward in Ottawa. Residents pay a stormwater charge of $252.97 this year, up 7.6%, and deserve to see what it fixed on their street.”
(a few sentences)
Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 8 · October 9, 2026
Confidence:High
Are the rules fair, and are they actually enforced?
Not reviewed yet. Know something?
Candidates and members of the public can both report a correction. Every one is logged and answered, and corrections about a candidate’s own positions get priority.