Skip to main content

← Ward 22 Riverside South-Findlay Creek Councillor

Compare candidates

Ward 22 Riverside South-Findlay Creek Councillor · Ottawa

2 candidates for 1 seat

Everyone is compared on the same 16 issues, in the same order. Candidates are listed alphabetically, and the order of issues is not a ranking. Each candidate's bio appears at the top, above the issues. How this works.

Bio

Muyiwa Ojo

No bio on record. Know something?

Steve Desroches Elected (official result)

No bio on record. Know something?

Housing

Will I be able to afford to live here?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Taxes & spending

What happens to my tax bill, and where does the money go?

Muyiwa Ojo

No website or social media listed

Muyiwa Ojo would consider Other to address Ottawa's infrastructure requirements.

  • Other
Show their words & source (one sentence)
“Other;”

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Emergency services

When I call for help, will it come fast enough?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Transit

Can I get where I need to go without driving?

Muyiwa Ojo

No website or social media listed

This candidate has spoken about this issue more than once. Each statement is shown with its own source.

Muyiwa Ojo would prioritize improving OC Transpo frequency and reliability before major expansion if Ottawa receives significant new

  • Improving OC Transpo frequency and reliability before major expansion
“Improving OC Transpo frequency and reliability before major expansion”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo assigns medium priority to the western Stage 3 LRT extension toward Kanata and Stittsville.

  • Medium priority
“Medium priority”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo names “Transit” as their second infrastructure priority for 2026–2030.

  • Transit
“Transit”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo is undecided on, saying more study is required for the proposed STO Gatineau–Ottawa tram.

  • Undecided / more study required
“Undecided / more study required”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Think we’ve got this wrong?

Steve Desroches Elected (official result)

No website or social media listed

Desroches has pushed for a north-south rapid transit rail network since his first days in office.

  • Has rallied since his first days in office for a north-south rapid transit rail network
  • Championed the Vimy Memorial Bridge to improve transit connections and support local business
Show their words & source (a page or more)
“From his first days in office, Councillor Desroches rallied for the construction of a north-south rapid transit rail network.”

Source: Steve Desroches | About

Confidence:High

Government

Will decisions be made in the open, and will anyone answer for them?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Roads & infrastructure

Will the things I use every day actually get fixed?

Muyiwa Ojo

No website or social media listed

This candidate has spoken about this issue more than once. Each statement is shown with its own source.

Muyiwa Ojo would establish flood resilience and stormwater infrastructure as one of Ottawa's top three capital priorities.

  • Yes
“Yes”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo is undecided on a Kettle Island interprovincial bridge, saying more study is required.

  • Undecided / more study required
“Undecided / more study required”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo: Primarily renewal — Ottawa should prioritize repairing existing infrastructure before undertaking significant new expansion.

  • Primarily renewal — Ottawa should prioritize repairing existing infrastructure before undertaking significant new expansion.
“Primarily renewal — Ottawa should prioritize repairing existing infrastructure before undertaking significant new expansion.”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo named Accelerated sewer separation and flood resilience infrastructure; Other BRT and transit priority corridors

  • Accelerated sewer separation and flood resilience infrastructure
  • Other BRT and transit priority corridors
  • Bridge and structural renewal
  • Road resurfacing and renewal
“• Accelerated sewer separation and flood resilience infrastructure • Other BRT and transit priority corridors • Bridge and structural renewal • Road resurfacing and renewal”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo says further information is required before deciding on a ring road or bypass study.

  • Perhaps — further information is required
“Perhaps — further information is required”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo supports increasing Ottawa's road resurfacing and road renewal budget during the next term of Council.

  • Support
“Support”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo: Support selectively, after considering costs, safety, land use, environmental effects and alternatives

  • Support selectively, after considering costs, safety, land use, environmental effects and alternatives
“Support selectively, after considering costs, safety, land use, environmental effects and alternatives”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo ranked “Flood prevention, stormwater and sewer infrastructure” as their #1 infrastructure investment priority.

  • Flood prevention, stormwater and sewer infrastructure
  • Public transit — buses and Bus Rapid Transit
  • Public transit — rail
“1. Flood prevention, stormwater and sewer infrastructure 2. Public transit — buses and Bus Rapid Transit 3. Public transit — rail 4. Pedestrian infrastructure and sidewalks 5. Renewal of existing roads and bridges 6. New or expanded roads 7. Cycling infrastructure 8. Truck and goods movement infrastructure”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo's infrastructure vision: Ottawa needs to plan beyond individual projects and look at the complete infrastructure network

  • Ottawa needs to plan beyond individual projects and look at the complete infrastructure network: roads, transit, sidewalks, cycling and pedestrian…
  • For growing communities like Riverside South and Findlay Creek, that means coordinating infrastructure investment with development so residents are not left…
  • It also means maintaining the infrastructure we already have, investing responsibly in new capacity, and designing streets and public spaces that are safe,…
“Ottawa needs to plan beyond individual projects and look at the complete infrastructure network: roads, transit, sidewalks, cycling and pedestrian connections, water and sewer systems, parks, recreation facilities and community services. For growing communities like Riverside South and Findlay Creek, that means coordinating infrastructure investment with development so residents are not left waiting for the roads, transportation options and services they need. It also means maintaining the infrastructure we already have, investing responsibly in new capacity, and designing streets and public spaces that are safe, accessible and connected. My approach would be practical: listen to residents, identify gaps early, prioritize projects based on need and growth, pursue available funding partnerships, and report back regularly on progress. Growth should be planned for—and infrastructure should keep pace with it.”

(several paragraphs)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo names “Better Roads” as their third infrastructure priority for 2026–2030.

  • Better Roads
“Better Roads”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo ranked “Transit — bus / BRT” as the transportation mode most deserving additional public investment.

  • Transit — bus / BRT
  • Transit — rail
  • Vehicular / road infrastructure
“1. Transit — bus / BRT 2. Transit — rail 3. Vehicular / road infrastructure 4. Cycling 5. Pedestrian 6. Truck / goods movement”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo selected Advocate for capacity or operational improvements at major bottlenecks

  • Advocate for capacity or operational improvements at major bottlenecks
  • Coordinate provincial construction schedules to reduce simultaneous traffic disruptions
“• Advocate for capacity or operational improvements at major bottlenecks • Coordinate provincial construction schedules to reduce simultaneous traffic disruptions”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo names “Infrastructure” as their first infrastructure priority for 2026–2030.

  • Infrastructure
“Infrastructure”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo is undecided on, saying more information is required for transferring ownership and responsibility for Ottawa Road 174 to the

  • Undecided / more information required
“Undecided / more information required”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo says the City should require or evaluate Improved regional movement of people and goods

  • Improved regional movement of people and goods
  • Acceptable environmental and land-use impacts
“• Improved regional movement of people and goods • Acceptable environmental and land-use impacts”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo would defer, reconsider or not pursue as a first initiative: “Flood prevention initiatives”.

  • Flood prevention initiatives
“Flood prevention initiatives”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo would prioritize Larger or upgraded storm sewers in flood-prone areas; Stormwater management ponds and facilities

  • Larger or upgraded storm sewers in flood-prone areas
  • Stormwater management ponds and facilities
  • Residential flood-protection programs, including backwater valves and sump systems
“• Larger or upgraded storm sewers in flood-prone areas • Stormwater management ponds and facilities • Residential flood-protection programs, including backwater valves and sump systems”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo: additional road-renewal funding should be directed principally to allocation based principally on road condition and risk.

  • Allocation based principally on road condition and risk
“Allocation based principally on road condition and risk”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Think we’ve got this wrong?

Steve Desroches Elected (official result)

No website or social media listed

Desroches pledges to keep advocating for timely approvals so Findlay Creek infrastructure projects move forward.

  • Says real progress is being made on Findlay Creek infrastructure and services
  • Pledges to keep advocating for the timely approvals projects need
  • Has raised the federal land-acquisition delay for the Bank–Leitrim intersection at City Hall
Show their words & source (several paragraphs)
“We are making real progress on improving infrastructure and services for residents in Findlay Creek, and I will continue advocating for the timely approvals needed to move these projects forward.”

Source: Bank and Leitrim Intersection | Councillor/Conseiller Steve Desroches

Confidence:High

Economy

Will our main streets and local jobs thrive?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Environment

Is the candidate protecting the nature we live in?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Desroches points to planting 10,000+ trees and protecting the ward's first large urban woodlot.

  • Says he helped build a clean and green city with 10,000+ trees planted in the ward
  • Acquired and protected the ward's first large urban woodlot
Show their words & source (a page or more)
“He has helped build a clean and green city by planting over 10,000 trees in the ward and by acquiring and protecting the ward’s first large urban woodlot.”

Source: Steve Desroches | About

Confidence:High

Healthcare

Will there be a doctor and a hospital when we need one?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Growth & development

How fast should we grow, and who decides what gets built where?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Desroches says infrastructure must keep pace with housing growth, pressing Ottawa and the NCC to advance the Bank–Leitrim fix.

  • Says infrastructure must keep pace with housing growth
  • Welcomes the $50 million Bank Street renewal and detailed design work on the Bank–Leitrim intersection
  • Urges federal (NCC) cooperation so the land acquisition keeps the project on track
Show their words & source (several paragraphs)
“Infrastructure must keep pace with housing growth.”

Source: Bank and Leitrim Intersection | Councillor/Conseiller Steve Desroches

Confidence:High

Social & community services

Who looks after the most vulnerable residents?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Desroches calls the Southeast Ottawa Recreation Complex — pool, rinks, gym — a priority project for the ward.

  • Calls the Riverside South/Findlay Creek recreation complex a priority project for the community
  • Phase 1: 25-metre pool, leisure pool, two NHL rinks, gymnasium and outdoor amenities
  • Design to finish 2027, building ready mid-2029
Show their words & source (a page or more)
“The new recreation complex for Riverside South and Findlay Creek is a priority project for our community.”

Source: Steve Desroches | Southeast Ottawa Rec Complex

Confidence:High

Active transportation

Can I walk and bike safely around town?

Muyiwa Ojo

No website or social media listed

This candidate has spoken about this issue more than once. Each statement is shown with its own source.

Muyiwa Ojo would reconsider cycling infrastructure investment after further review.

  • Reconsider investment after further review
“Reconsider investment after further review”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo commits to advancing “Bank Street is a critical connection for Riverside South and Findlay Creek

  • Bank Street is a critical connection for Riverside South and Findlay Creek, and its infrastructure must serve everyone who relies on it—drivers, transit…
  • I would work to ensure the project stays on schedule, that construction impacts are properly managed, and that the corridor delivers safer intersections,…
  • My broader goal would be to make sure transportation planning in Ward 22 stays ahead of growth rather than continually reacting to it.
“Bank Street is a critical connection for Riverside South and Findlay Creek, and its infrastructure must serve everyone who relies on it—drivers, transit users, cyclists and pedestrians. I would work to ensure the project stays on schedule, that construction impacts are properly managed, and that the corridor delivers safer intersections, better active transportation connections and more reliable movement through our growing community. My broader goal would be to make sure transportation planning in Ward 22 stays ahead of growth rather than continually reacting to it.”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo would emphasize Suburban cycling networks; Connections to LRT and major transit stations; Connections to schools

  • Suburban cycling networks
  • Connections to LRT and major transit stations
  • Connections to schools, recreation facilities and community destinations
“• Suburban cycling networks • Connections to LRT and major transit stations • Connections to schools, recreation facilities and community destinations”

(a few sentences)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Muyiwa Ojo supports increasing Ottawa's investment in sidewalks, pedestrian crossings and connections to transit.

  • Support
“Support”

(one sentence)

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Think we’ve got this wrong?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Arts & culture

Does the candidate value what makes this place feel alive?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Data centres

Should energy-hungry data centres be welcomed here?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Water & waste

Is our drinking water safe and our waste handled?

Muyiwa Ojo

No website or social media listed

Muyiwa Ojo supports accelerating separation of remaining combined sewers.

  • Support
Show their words & source (one sentence)
“Support”

Source: FCA Ottawa 2026 Candidate Survey on Infrastructure Priorities — Ward 22 · October 9, 2026

Confidence:High

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Bylaw enforcement

Are the rules fair, and are they actually enforced?

Muyiwa Ojo

No website or social media listed

Not reviewed yet. Know something?

Steve Desroches Elected (official result)

No website or social media listed

Not reviewed yet. Know something?

Something wrong here?

Candidates and members of the public can both report a correction. Corrections from candidates about their own positions are handled first.

Report a correction →